Product List
PRODUCT LIST-
CONTACT US
- Contact: Mr.Wang
- Mobile: 13585000194
- Mobile: 15861488616
- Tel: 0510-85388408
- Fax: 0510-85388408
- Web: www.wxkbjx.com
- E-mail: sales@wxkbjx.com
- 502492439@qq.com
- Add: 42 Yuanqiao Road, Yixing
- Economic Development
- Zone, Wuxi City
Advantages of Construction of Fully Mechanized Draft
Safe and reliable, on the soil disturbance small clearance clearance Pile construction method in the steel casing within the clearance pile and backfill construction, the underground undisturbed soil or damage is not small, the underground soil does not cause disturbance or produce a small The disturbance. As the steel casing on the hole wall support, in the steel casing around the soil stress has not yet released, it has been removed and timely backfill obstacles, the surrounding structures had no effect.
Prev:None
Next:None
related articles
- Introduction of Construction Method of Drilling Biting Pile for Zoomlion ZRT Series Full Rotary Drilling Rig
- Create a third-party full casing and auxiliary parts rental service, and explore new ways of cooperation!
- Wonderful review——into Kengbo Machinery
- The 10th Deep Foundation Engineering Development Forum and the 2nd Deep Foundation Engineering Techn
- The 9th Deep Foundation Forum Highlights
- Kengbo Machinery and Nanjing Yaohang Construction Engineering Co., Ltd. re-engaged to create brillia
- Kengbo mechanical casing escorts Nanjing Yaohang Construction Engineering Co., Ltd.
- Kengbo mechanical casing escorts the bite pile project of Anhui Chuangtai Foundation Engineering Co.
- Keng Bo Machinery 2018 BMW Exhibition Scene Highlights
- The main process points of full - tube full - turn drilling